Welcome to TRD - CIRCULARS
This 8 hour course will teach you all the required skills needed when designing and developing a live WordPress website, including using the advanced options of HTML and CSS.
TRD - CIRCULARS
Role and function. The officers of this cadre are responsible to maintain the assets of the Electrical Department in Indian railways. Mainly divided in following branches General Service(G), Traction Operation(TrO), Traction distribution(TrD), Traction Rolling Stock(TRS).
TRD CIRCULARS LINK HERE
Dynamic Post
www.irtrd.com
GRID FAILURES MEASURES
GRID MANAGEMENT STRATEGIES...read more
CHECKING THE HEALTH OF POWER ..readmore
DESIGN AND PROCUREMENT OF ONLY 8 WHEELER TW ON IR
CREATION OF NEW PLAN HEAD FOR TRACTION DISTRIBUT..
CORROSION RESISTANT PAINT FOR OUTDOOR STRUCT.....
COMPREHENSIVE POLICY FOR INSULATORS
CODAL LIFE OF TRD ASSETS
CHECKING OF POWER LINE CROSSING
CHARGES APPLICABLE FOR RAILWAYS WORK BEING EXECUTED BY OUTSIDE AGENCIES
OUTSOURCING OF VARIOUS ACTIVITIES IN IR
OHE DESIGN IN VIEW OF CHANGED ..read more
NORMS/YARDSTICK OF 8W TW IN IR
JPO FOR GRANTING PERMISSION TO ..read more
TI/PSI/PROTCT/CONVEN/12 DATED 11.04.2014
29TH MSG RECOMMENDATIONS
RB LETTER NO. 2003/RE/161/1/Vol III/Pt.
RDSO LETTER NO TI/PSI/PROTCT/FAIL...
RB LETTER No EVEN DATED 12.05.2016
USE OF 9T COMPOSITE INSULATORS .....
JPO FOR GRANTING PERMISSION FOR
JPO FOR GRANTING PERMISSION ...read more
ACTION PLAN FOR MANPO...read more
CONDITION BASED OVERHAULING OF TRACTION POWER TRANSFORMER PART-1
CONDITION BASED OVERHAULING OF TRACTION POWER TRANSFORMER PART-2
Recent Post
irtrd.in1@gmail.com
INPUTS REQUIRED FOR 160 KMPH FOR DELHI-HOWRAH......
INPUTS REQUIRED FOR 160KMPH TRAINS OPE...19/10/2016
INPUTS REQUIRED FOR 160KMPH TRAINS OP........OF 23.12.2016
OUTSOURCING OF PSI-TRD ACTIVIES FOR ELECTRIFIED.....
POWER THROUGH OPEN ACCESS FOR NEW TRACTION SUB...
PRECAST FOUNDATION FOR QUALITY WORKS AND SPEED....
REVAMPING TRAINING FACILITIES FOR TRD AND GENER ....
TRAFFIC AND POWER BLOCK CHARGES FOR MAINTENANC..
SHORT PTFE TYPE NEUTRAL SECTION FAILURE
CONTACT WIRE WEAR AT GRADIENT BY PANTOGRAPH....
ARTHUR FLURRY TYPE SHORT NEUTRAL SECTION ERECT..
HIGH SPEED OHE FOR IR ISSUES, CHALLENGES AND OPTIONS
RAILWAY ELECTRIFICATION SYSTEMS
SCHEDULE OF INSPECTIONS ELECTRICAL(TRD)
HIRING OF VEHICLES FOR TRD ORGANISATIONS
GUIDELINES FOR STANDARDISATION OF VARIOUS COLOU
BACK UP POWER SUPPLY FROM AUXILIARY TRANSFORMER
POWER SUPPLY TO SIGNALLING AND TELECOMMUNICAT......
POWER SUPPLY ARRANGEMENTS FOR SIGNALLING AND TE...
INTEGRATED RENEWABLE ENERGY BASED BACK UP POWE..
PROVISION OF AIR CONDITIONING EQUIPMENT OF
OHE DESIGN IN VIEW OF CHANGED WIND ZONES
CARTEL FORMATION AND MERGER OF PART-I AN.........
OHE FOUNDATIONS DRAWINGS FOR INCREASED IMP..
OHE SPAN IN ALWAR REWARI SECTION OF NWR F......
Random Post
contact_us
PLANNING OF OHE LAYOUT WHILE EXECUTING ELEC....
OUTSOURCING OF PSI/TRD MAINTENANCE ACTIVITIES F.......
PARTICIPATION OF JOINT VENTURE FIRMS IN WORKS TENDER IN INDIAN RAILWAYS
PRICE VARIATION CLAUSES
PROCEDURE OF DIGGING IN THE VICINITY OF SIGNALLING....
PROVISION OF NUMERICAL RELAY PANELS ON TRAC..
REDUCTION OF THE COST OF RAILWAY DATED....... 25.03.1994
REDUCTION OF THE COST OF RAILWAY ELECTRIFICATION PROJECTS USE OF SPUN MAST
UPGRADATION AND REPAIRING OF TR.
REVISED CODAL LIFE OF ASSETS (TW)
RELIABILITY IMPROVEMENT MEASURES IN TRD (BRAZING JOINTS)
PROVISION OF RETRO REFLECTIVE NUMBER PLATES
PROVISION OF ELECTRICAL ESTIMATE (TRD) IN INITIAL STAGE WHILE CONSIDERING DOUBLING/3RD LINE
PRECAUTIONS NEEDS TO BE TAKEN IN ELECTRIFIED TERRITORY
STANDARD IMPLANTATION IN NEW ELECTRIFICATION WORKS
12 POINT ACTION PLAN FOR TRD REPORTING
MEASURES TO BE TAKEN FOR IMPROVING RELIABILITY
MEASURES FOR IMPROVING OHE RELIABILITY
MANPOWER PLANNING NORMS ELECTRICAL
MAINTENANCE OF TW
PROVISION OF ELECTRICAL(TRD) ESTIMATE AT INITIAL STAGE WHILE CONSIDERING
SLEWING AND ALTERATION OF TRACK INVOLVING ADJUSTMENT
JPO FOR PROTECTING ELECTRICAL AND S&T CABLE
ACTM CORRECTION SLIP NO 21
INPUTS REQUIRED FOR RUNNING OF TRAINS AT 150KMPH
GUIDELINES FOR OHE ARRANGEMENTS AT TTC
TRD CIRCULARS
ELECTRICAL(TRD) CIRCULARS … Reliability improvement measures in TRD – Failures of brazing joints. 13.07.2012. 2002/Elect(G)/161/21 Vol.-II, Coprehensive policy regarding insulators for 25 kV AC traction on Indian Railways.